Care home solar PPA

Solar PPA assessment: Acomb Court

Indicative solar PV potential analysis for Acomb Court in Northumberland. Site-specific irradiance, system sizing, and PPA economics for UK care homes.

Solar PPA potential for Acomb Court

Acomb Court in Northumberland, postcode NE46 1EN is a CQC-registered care home in the UK Solar Fund commercial solar PPA programme. Care homes have steady 24/7 electricity demand — from lighting and HVAC through to lift operation and growing electric heat pump systems. A Solar Power Purchase Agreement (PPA) cuts that bill 20-40% with no upfront capital.

190 kWp
Indicative system size
751
kWh/kWp/yr (location-specific)
142,729
kWh/yr generation
£17,127
Annual saving (estimated)
CQC Location ID1-112448479
Care home nameAcomb Court
PostcodeNE46 1EN
City / areaNorthumberland
Bed capacity76 beds
Inspection categoryResidential social care
Latest CQC ratingGood

Solar yield in Northumberland

EU JRC PVGIS modelling for postcode NE46 1EN shows annual solar yield of 751 kWh per kWp per year-14% below the UK average.

Why care homes are a strong fit for solar PPAs

UK care homes typically run 24/7/365 with steady electricity demand from: continuous lighting, heating + hot water (often heat pump-driven in newer builds), kitchen and laundry operations, lift and stair-lift power, increasing IT load for record-keeping, and resident comfort systems.

A Solar PPA delivers immediate cost savings without diverting capital from resident services or staff costs. CQC inspectors increasingly view sustainability commitments positively. Local authority placement contracts often weight sustainability scoring.

Zero upfront cost

Funder pays for design, install, monitoring, maintenance — 25-year contract

Fixed below-market rate

Per-kWh price typically 20-40% below grid; protects against tariff volatility

Heat pump compatible

Solar covers the rising electricity cost of converting from gas heating

CQC + LA aligned

Sustainability story strengthens commissioner relationships

No resident disruption

External installation, no resident displacement

End of term: £1 transfer

System ownership transfers to home for nominal £1 after PPA

Next step for Acomb Court

For a tailored, site-specific PPA assessment for Acomb Court, our team conducts a free on-site survey covering roof condition, structural capacity, electrical infrastructure, and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown for Acomb Court are indicative based on CQC-registered data, postcode-specific solar irradiance, and care home benchmarks. Actual PPA economics depend on site-specific factors (roof condition, orientation, consumption profile, grid connection) and are confirmed during a free on-site assessment. UK Solar Fund has no operational relationship with Acomb Court.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment