Indicative solar PV potential analysis for Silver Birch in West Midlands. Site-specific irradiance, system sizing, and PPA economics for UK care homes.
Silver Birch in West Midlands, postcode B24 0AR is a CQC-registered care home in the UK Solar Fund commercial solar PPA programme. Care homes have steady 24/7 electricity demand — from lighting and HVAC through to lift operation and growing electric heat pump systems. A Solar Power Purchase Agreement (PPA) cuts that bill 20-40% with no upfront capital.
| CQC Location ID | 1-112953306 |
| Care home name | Silver Birch |
| Postcode | B24 0AR |
| City / area | West Midlands |
| Bed capacity | 7 beds |
| Inspection category | Residential social care |
| Latest CQC rating | Requires improvement |
EU JRC PVGIS modelling for postcode B24 0AR shows annual solar yield of 805 kWh per kWp per year — -7% vs UK average.
UK care homes typically run 24/7/365 with steady electricity demand from: continuous lighting, heating + hot water (often heat pump-driven in newer builds), kitchen and laundry operations, lift and stair-lift power, increasing IT load for record-keeping, and resident comfort systems.
A Solar PPA delivers immediate cost savings without diverting capital from resident services or staff costs. CQC inspectors increasingly view sustainability commitments positively. Local authority placement contracts often weight sustainability scoring.
Funder pays for design, install, monitoring, maintenance — 25-year contract
Per-kWh price typically 20-40% below grid; protects against tariff volatility
Solar covers the rising electricity cost of converting from gas heating
Sustainability story strengthens commissioner relationships
External installation, no resident displacement
System ownership transfers to home for nominal £1 after PPA
For a tailored, site-specific PPA assessment for Silver Birch, our team conducts a free on-site survey covering roof condition, structural capacity, electrical infrastructure, and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.
Figures shown for Silver Birch are indicative based on CQC-registered data, postcode-specific solar irradiance, and care home benchmarks. Actual PPA economics depend on site-specific factors (roof condition, orientation, consumption profile, grid connection) and are confirmed during a free on-site assessment. UK Solar Fund has no operational relationship with Silver Birch.
Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.
Book an assessment