Care home solar PPA

Solar PPA assessment: Sycamore Care Centre

Indicative solar PV potential analysis for Sycamore Care Centre in Tyne and Wear. Site-specific irradiance, system sizing, and PPA economics for UK care homes.

Solar PPA potential for Sycamore Care Centre

Sycamore Care Centre in Tyne and Wear, postcode SR4 8PQ is a CQC-registered care home in the UK Solar Fund commercial solar PPA programme. Care homes have steady 24/7 electricity demand — from lighting and HVAC through to lift operation and growing electric heat pump systems. A Solar Power Purchase Agreement (PPA) cuts that bill 20-40% with no upfront capital.

282 kWp
Indicative system size
790
kWh/kWp/yr (location-specific)
222,991
kWh/yr generation
£26,758
Annual saving (estimated)
CQC Location ID1-118559328
Care home nameSycamore Care Centre
PostcodeSR4 8PQ
City / areaTyne and Wear
Bed capacity113 beds
Inspection categoryResidential social care
Latest CQC ratingGood

Solar yield in Tyne and Wear

EU JRC PVGIS modelling for postcode SR4 8PQ shows annual solar yield of 790 kWh per kWp per year-9% below the UK average.

Why care homes are a strong fit for solar PPAs

UK care homes typically run 24/7/365 with steady electricity demand from: continuous lighting, heating + hot water (often heat pump-driven in newer builds), kitchen and laundry operations, lift and stair-lift power, increasing IT load for record-keeping, and resident comfort systems.

A Solar PPA delivers immediate cost savings without diverting capital from resident services or staff costs. CQC inspectors increasingly view sustainability commitments positively. Local authority placement contracts often weight sustainability scoring.

Zero upfront cost

Funder pays for design, install, monitoring, maintenance — 25-year contract

Fixed below-market rate

Per-kWh price typically 20-40% below grid; protects against tariff volatility

Heat pump compatible

Solar covers the rising electricity cost of converting from gas heating

CQC + LA aligned

Sustainability story strengthens commissioner relationships

No resident disruption

External installation, no resident displacement

End of term: £1 transfer

System ownership transfers to home for nominal £1 after PPA

Next step for Sycamore Care Centre

For a tailored, site-specific PPA assessment for Sycamore Care Centre, our team conducts a free on-site survey covering roof condition, structural capacity, electrical infrastructure, and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown for Sycamore Care Centre are indicative based on CQC-registered data, postcode-specific solar irradiance, and care home benchmarks. Actual PPA economics depend on site-specific factors (roof condition, orientation, consumption profile, grid connection) and are confirmed during a free on-site assessment. UK Solar Fund has no operational relationship with Sycamore Care Centre.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment