Factory solar PPA

Solar PPA: 1ST FLOOR OFFICE 1.5

Indicative solar PV potential for 1ST FLOOR OFFICE 1.5, BS37 4AX. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at 1ST FLOOR OFFICE 1.5

1ST FLOOR OFFICE 1.5, 19 West Walk in E06000025, postcode BS37 4AX, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
840
kWh/kWp/yr (location)
42,011
kWh/yr generation
£5,041
Annual saving (est)
Site address1ST FLOOR OFFICE 1.5, 19 West Walk
PostcodeBS37 4AX
Local authorityE06000025
Property typeOffices and Workshop Businesses
Floor area32 m²
EPC asset ratingC

Solar yield at BS37 4AX

EU JRC PVGIS modelling for BS37 4AX shows annual solar yield of 840 kWh per kWp per year-3% vs UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.