Factory solar PPA

Solar PPA: 71-77 Dryden Street

Indicative solar PV potential for 71-77 Dryden Street, BB12 7EN. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at 71-77 Dryden Street

71-77 Dryden Street, Padiham in E07000117, postcode BB12 7EN, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
736
kWh/kWp/yr (location)
36,812
kWh/yr generation
£4,417
Annual saving (est)
Site address71-77 Dryden Street, Padiham
PostcodeBB12 7EN
Local authorityE07000117
Property typeOffices and Workshop Businesses
Floor area302 m²
EPC asset ratingD

Solar yield at BB12 7EN

EU JRC PVGIS modelling for BB12 7EN shows annual solar yield of 736 kWh per kWp per year-15% below the UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment