Factory solar PPA

Solar PPA: COSMETIC REPAIR BUILDING

Indicative solar PV potential for COSMETIC REPAIR BUILDING, CA6 4SQ. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at COSMETIC REPAIR BUILDING

COSMETIC REPAIR BUILDING, Mercedes Benz Carlisle in E06000063, postcode CA6 4SQ, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
~900
kWh/kWp/yr (location)
45,000
kWh/yr generation
£5,400
Annual saving (est)
Site addressCOSMETIC REPAIR BUILDING, Mercedes Benz Carlisle
PostcodeCA6 4SQ
Local authorityE06000063
Property typeB1 Offices and Workshop businesses
Floor area618 m²
EPC asset ratingA

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment