Indicative solar PV potential for DHL TRAINING OFFICE BRISTOL AIRPORT, NORTH SIDE ROAD, LOADING BAY WEST TERMINAL, BS48 3DY. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.
DHL TRAINING OFFICE BRISTOL AIRPORT, NORTH SIDE ROAD, LOADING BAY WEST TERMINAL, Bristol International Airport in E06000024, postcode BS48 3DY, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.
| Site address | DHL TRAINING OFFICE BRISTOL AIRPORT, NORTH SIDE ROAD, LOADING BAY WEST TERMINAL, Bristol International Airport |
| Postcode | BS48 3DY |
| Local authority | E06000024 |
| Property type | B1 Offices and Workshop businesses |
| Floor area | 68 m² |
| EPC asset rating | B |
Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.
For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.
No capital diversion from production line
20-40% below grid for 10-25 year term
Annual servicing, monitoring, insurance, repairs
Around production shifts, no operational disruption
Audit-grade renewable generation for supply chain customers
Asset transfers to operator for free electricity afterwards
For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.
Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.
Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.
Book an assessment