Factory solar PPA

Solar PPA: FIRST FLOOR

Indicative solar PV potential for FIRST FLOOR, BA12 9HQ. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at FIRST FLOOR

FIRST FLOOR, BOREHAM MILL in E06000054, postcode BA12 9HQ, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
863
kWh/kWp/yr (location)
43,160
kWh/yr generation
£5,179
Annual saving (est)
Site addressFIRST FLOOR, BOREHAM MILL
PostcodeBA12 9HQ
Local authorityE06000054
Property typeB1 Offices and Workshop businesses
Floor area235 m²
EPC asset ratingE

Solar yield at BA12 9HQ

EU JRC PVGIS modelling for BA12 9HQ shows annual solar yield of 863 kWh per kWp per year — right at the UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment