Factory solar PPA

Solar PPA: GROUND FLOOR AND BASEMENT EAST

Indicative solar PV potential for GROUND FLOOR AND BASEMENT EAST, AL10 0LW. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at GROUND FLOOR AND BASEMENT EAST

GROUND FLOOR AND BASEMENT EAST, Queensway House in E07000241, postcode AL10 0LW, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
851
kWh/kWp/yr (location)
42,554
kWh/yr generation
£5,106
Annual saving (est)
Site addressGROUND FLOOR AND BASEMENT EAST, Queensway House
PostcodeAL10 0LW
Local authorityE07000241
Property typeB1 Offices and Workshop businesses
Floor area264 m²
EPC asset ratingD

Solar yield at AL10 0LW

EU JRC PVGIS modelling for AL10 0LW shows annual solar yield of 851 kWh per kWp per year — right at the UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment