Solar PPA: IMPERIAL TOBACCO HEAD OFFICE BUILDING

Indicative solar PV potential for IMPERIAL TOBACCO HEAD OFFICE BUILDING, BS3 2LL. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at IMPERIAL TOBACCO HEAD OFFICE BUILDING

IMPERIAL TOBACCO HEAD OFFICE BUILDING, Imperial Tobacco Ltd in E06000023, postcode BS3 2LL, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

380 kWp
Indicative system size
856
kWh/kWp/yr (location)
325,618
kWh/yr generation
£39,074
Annual saving (est)
Site addressIMPERIAL TOBACCO HEAD OFFICE BUILDING, Imperial Tobacco Ltd
PostcodeBS3 2LL
Local authorityE06000023
Property typeB1 Offices and Workshop businesses
Floor area5,438 m²
EPC asset ratingC

Solar yield at BS3 2LL

EU JRC PVGIS modelling for BS3 2LL shows annual solar yield of 856 kWh per kWp per year — right at the UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.