Factory solar PPA

Solar PPA: LINE HAUL DE-BRIEF BUILDING

Indicative solar PV potential for LINE HAUL DE-BRIEF BUILDING, B69 4DA. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at LINE HAUL DE-BRIEF BUILDING

LINE HAUL DE-BRIEF BUILDING, DPD Group UK LTD in E08000028, postcode B69 4DA, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
804
kWh/kWp/yr (location)
40,233
kWh/yr generation
£4,827
Annual saving (est)
Site addressLINE HAUL DE-BRIEF BUILDING, DPD Group UK LTD
PostcodeB69 4DA
Local authorityE08000028
Property typeB1 Offices and Workshop businesses
Floor area185 m²
EPC asset ratingA

Solar yield at B69 4DA

EU JRC PVGIS modelling for B69 4DA shows annual solar yield of 804 kWh per kWp per year-8% vs UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment