Factory solar PPA

Solar PPA: Office

Indicative solar PV potential for Office, BH12 4FR. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at Office

Office, 56 Herbert Avenue in E06000058, postcode BH12 4FR, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
909
kWh/kWp/yr (location)
45,479
kWh/yr generation
£5,457
Annual saving (est)
Site addressOffice, 56 Herbert Avenue
PostcodeBH12 4FR
Local authorityE06000058
Property typeOffices and Workshop Businesses
Floor area58 m²
EPC asset ratingB

Solar yield at BH12 4FR

EU JRC PVGIS modelling for BH12 4FR shows annual solar yield of 909 kWh per kWp per year+5% vs UK average.

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.