Factory solar PPA

Solar PPA: Unit 2 Court Lane Business Park

Indicative solar PV potential for Unit 2 Court Lane Business Park, BH23 7BN. Site-specific irradiance, real EPC data, and PPA economics for UK manufacturers.

Solar PPA potential at Unit 2 Court Lane Business Park

Unit 2 Court Lane Business Park, Ringwood Road in E07000091, postcode BH23 7BN, is a UK industrial/manufacturing facility in the UK Solar Fund commercial solar PPA programme. Manufacturing represents around 17% of total UK industrial electricity consumption. Energy is one of the largest controllable cost lines for manufacturers, and Solar PPAs cut it without diverting capital from production.

50 kWp
Indicative system size
~900
kWh/kWp/yr (location)
45,000
kWh/yr generation
£5,400
Annual saving (est)
Site addressUnit 2 Court Lane Business Park, Ringwood Road
PostcodeBH23 7BN
Local authorityE07000091
Property typeOffices and Workshop Businesses
Floor area47 m²
EPC asset ratingC

Why this site is well-suited to Solar PPA

Manufacturing facilities typically have 5,000-50,000 m² of suitable roof space supporting 500kWp to 5MWp+ installations. High daytime electricity demand from production aligns with solar generation. Stable shift patterns and predictable demand let funders price the PPA confidently.

For ESG-focused supply chains (FMCG, retail, food), solar PPAs provide audit-ready Scope 2 reductions superior to "100% renewable tariff" purchases.

Zero upfront cost

No capital diversion from production line

Fixed-rate energy

20-40% below grid for 10-25 year term

All O&M included

Annual servicing, monitoring, insurance, repairs

Phased install

Around production shifts, no operational disruption

ESG / Scope 2 ready

Audit-grade renewable generation for supply chain customers

£1 transfer at term end

Asset transfers to operator for free electricity afterwards

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey covering roof condition, structural capacity, electrical integration (harmonics, power factor), and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on UK Non-Domestic EPC register data and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment