Farm solar PPA

Solar PPA: SOLINGER FARM ENTERPRISES LIMITED

Indicative solar PV potential analysis for SOLINGER FARM ENTERPRISES LIMITED, HP7 0HT. Site-specific irradiance and PPA economics for UK farms and agricultural operations.

Solar PPA potential at SOLINGER FARM ENTERPRISES LIMITED

SOLINGER FARM ENTERPRISES LIMITED, postcode HP7 0HT, is a UK agricultural enterprise in the UK Solar Fund commercial solar PPA programme. Farms have some of the strongest fit for solar in the UK — large barn and shed roof areas, plus often available land for ground-mount. Solar PPAs deliver immediate cost reduction without diverting capital from operations.

250 kWp
Indicative system size
841
kWh/kWp/yr (location)
210,317
kWh/yr generation
£25,238
Annual saving (est)
Farm / business nameSOLINGER FARM ENTERPRISES LIMITED
PostcodeHP7 0HT
Region / county
Building typeAgricultural enterprise (CH)
Data sourceCH

Solar yield at HP7 0HT

EU JRC PVGIS modelling for HP7 0HT shows annual solar yield of 841 kWh per kWp per year-3% vs UK average.

Why farms suit Solar PPAs

UK farms have some of the largest available roof areas of any sector (large barns, sheds, livestock buildings), often south-facing, with minimal shading. Available land for ground-mount adds another option.

Many farms also have growing electricity demand from grain dryers, refrigeration (dairy / horticulture), milking parlours, and increasingly EV/electric machinery. Solar PPAs deliver cost reduction immediately.

For NFU members and tenant farmers, Solar PPAs allow the asset to be funded externally — no capital lock-up at the landowner level, no diversification consent issues.

Zero upfront cost

No capital tied up in solar; preserved for operations + investment

Roof OR ground-mount

Use barn/shed roofs, or commit field area for ground-mount

Diversification income

Surplus generation exports to grid; income stream

Sustainability narrative

For supply contracts requiring renewable sourcing

Tenant-friendly

Funded asset, no landowner capital required

25-year term + £1 transfer

Long-term low-cost energy for the operation

Next step

For a tailored site-specific PPA assessment, our team conducts a free on-site survey. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown are indicative based on public sources (NDEPC register, Companies House) and PVGIS solar irradiance. Actual PPA economics depend on site-specific factors. UK Solar Fund has no operational relationship with SOLINGER FARM ENTERPRISES LIMITED.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment