Hotel solar PPA

Solar PPA assessment: The Beauchamp

Indicative solar PV potential analysis for The Beauchamp. Site-specific irradiance, system sizing, and PPA economics for UK hotels.

Solar PPA potential for The Beauchamp

The Beauchamp, postcode area WC1N 3RA is a UK hotel in the UK Solar Fund commercial solar PPA programme. Hotels have year-round daytime electricity demand — kitchens, HVAC, lighting, laundry — that aligns perfectly with solar generation. A Solar Power Purchase Agreement (PPA) cuts that bill 20-40% with zero capital outlay.

100 kWp
Indicative system size
851
kWh/kWp/yr (location)
85,172
kWh/yr generation
£10,220
Annual saving (est)
Hotel nameThe Beauchamp
Brand / chain
Operator
Rooms
Stars4
Nearest postcodeWC1N 3RA

Solar yield at The Beauchamp's location

EU JRC PVGIS modelling for this location shows annual solar yield of 851 kWh per kWp per year — right at the UK average.

Why hotels are a strong fit for solar PPAs

UK hotels typically have electricity bills representing 4-8% of total operating costs — second-largest line after staff. Solar PPAs cut this materially without requiring capital investment competing with refurbishment, new openings, or technology upgrades.

Hospitality consumption profiles align particularly well with solar generation: daytime kitchen prep, HVAC for guest comfort, laundry operations, and evening food service. Many properties achieve 60-80% self-consumption of solar generation, maximising the PPA economics.

Zero upfront cost

No capital diversion from refurbishment or expansion budgets

Sustainability marketing

Verifiable on-site renewables for corporate clients, sustainability disclosures, AA / OTAs

Brand differentiation

High-end hospitality increasingly requires verifiable Scope 2 reductions

No guest disruption

External installation, phased around seasons or off-peak periods

Heat pump compatible

Solar covers electrification of gas heating + DHW (huge for older hotels)

End of term: £1 transfer

System ownership transfers to hotel for nominal £1 after PPA

Next step for The Beauchamp

For a tailored, site-specific PPA assessment for The Beauchamp, our team conducts a free on-site survey covering roof condition, structural capacity, electrical infrastructure, and detailed consumption analysis. Indicative PPA rate, system specification, and savings forecast within 5-10 working days.

Figures shown for The Beauchamp are indicative based on OpenStreetMap location data and hotel sector benchmarks. Actual PPA economics depend on site-specific factors and are confirmed during a free on-site assessment. UK Solar Fund has no operational relationship with The Beauchamp.

Talk to UK Solar Fund

Get an indicative PPA rate and savings forecast for your site within 5-10 working days. No obligation, no upfront cost.

Book an assessment